
Bardos Town Hall: measurements before and after ATG treatment
November 11, 2026
Buzy Church: an ATG installation with a 60-metre coverage diameter
November 11, 2026Photographs show Buzy Town Hall before and after renovation: the same stone building, viewed from different angles, with changed pointing and finishes. The installation report identifies the Humidistop intervention separately from those at Buzy church and the rural seniors’ hall.
An identified installation
The geomagnetic installation was recorded on 17 May 2016 in the municipal council chamber. The stated coverage diameter is 30 metres, meaning 15 metres around the device. It is presented as an ATG wall-drying geomagnetic polarity inverter without electricity.
What the photographs show
The pictures illustrate the renovation of the façade and its surroundings; they do not show the installed device. Their shooting dates are not established in the file. They cannot replace measurements of moisture in masonry, and no final numerical drying result is attributed to the Town Hall.
Supporting old masonry
The installation report recommends good air circulation and work on the joints between stones to facilitate evaporation. This is a documented installation reference accompanied by renovation photographs, with the condition of the walls and their finishes remaining part of the project.






