Buzy Church: an ATG installation with a 60-metre coverage diameter
November 11, 2026
Guiche Church: renovation photographs and a documented Humidistop intervention
November 11, 2026The file for Buzy’s rural seniors’ hall combines an installation report with a later check. It concerns this community hall, not the Town Hall or the church.
Thirty-metre coverage
The intervention is dated 19 July 2016. The file describes an ST30 electromagnetic device, corresponding to Humidistop’s communicated ATE LC30 designation: a mains-powered wall-drying polarity inverter with a 30-metre coverage diameter. Follow-up took place on 7 March 2018.
Reported values
On the right-hand external wall, the calcium carbide results changed from 6.5 g/100 at installation to 1.1 g/100 at follow-up. Sampling height was 30 cm on both dates, but depth changed from 15 to 20 cm. The decrease must be read with this difference in sampling conditions.
Continuing to monitor the building
The file also notes partly buried walls and makes recommendations about ventilation, drainage, gutters and external finishes. The follow-up describes drying as ongoing and recommends leaving the installation in place. These figures relate to this sampling point under the conditions reported; they do not quantify every wall in the building.